The rains have started, mostly at night, and as you can see our parking area and road is doing well. This week we will start placing a 6" curb along the road edge to stabilize the road material.
After the curb is complete, we will install palms along the road with up-lighting. Inside we are complete with plastering the 1st floor units and 50% complete with the 2nd floor units. On the 1st floor we have started laying tiles. Copper AC line sets have been installed in the 1st floor units to the roof. Scaffolding is being setup along the exterior to start the plaster finish. The crews are working hard.