<< Return to September 2016 Newsletter

Ambergris Caye Infrastructure Develops


Infrastructure upgrades of all kinds continue to improve life on Ambergris Caye. Following an unscheduled blackout, Belize Electric Limited announced upgrades to the electric infrastructure on Ambergris Caye in a public meeting at the Lion’s Den in San Pedro Town. A new 25-megawatt transformer will be installed to ensure system capacity for future development. Also in the works is the installation of a parallel power supply line from Mexico to prevent outages due to issues along the single line currently in place.

Read full article >>